cpre bedfordshire logo

Skip to navigation

After a prolonged battle lasting several years, CPRE has at last prevailed upon the Planning Inspectorate to refuse permission for the installation of a windfarm consisting of twelve turbines, each 125 metres high, in the iconic landscape above Harrold and the River Great Ouse. 

join us

Back to top

woodland glade